Innowell DAR Assembly integrated in a lower completion, original engineering rendering
DENSITY-ACTIVATED AUTONOMOUS INFLOW CONTROL

Redefining
inflow control.

Different fluids. Different densities. One intelligent response.
DAR™ uses fluid density to autonomously control unwanted water and gas — right where production begins.

DAR™ · DENSITY ACTIVATED RECOVERYENGINEERED IN NORWAY · BUILT FOR THE RESERVOIR
FIELD MILESTONEFirst DAR installation completed at Johan Castberg · April 2026
Explore the deployment
THE PRODUCTION ADVANTAGE

More control.
Greater production potential.

Manage unwanted fluids at their source.
Unlock the potential of your reservoir.

Accelerated production

Designed to support high initial production while controlling unwanted water and gas breakthrough.

Improved recovery

Selective inflow control can improve reservoir sweep across heterogeneous formations.

Reduced development costs

Improved well performance may support efficient field development and lower fluid-handling requirements.

Lower associated emissions

Less unwanted fluid production can reduce energy used for processing and reinjection.

THE DAR PRINCIPLE

Different by density.
Autonomous by design.

DAR™ – Density Activated Recovery – is a patented, mechanical inflow control technology. It distinguishes between desired and undesired fluids using density differences, rather than depending primarily on viscosity.

Understand the technology
Original Innowell illustration of lower completion integration
LOWER COMPLETION · SELECTIVE RESERVOIR INFLOW
MODULAR ENGINEERING

One assembly.
Control that fits your well.

Explore the DAR Assembly
Original DAR Assembly rendering with configurable module locations
WCM module designation

Water Control Module

Selective control of unwanted water inflow. Closes when the configured water fraction is reached and can reopen when oil returns.

Discuss a configuration
GCM module designation

Gas Control Module

Selective control of unwanted gas inflow. Configurable closing and reopening criteria respond to changes in the in-situ gas fraction.

Discuss a configuration
LCM module designation

Liquid Control Module

Control of unwanted liquid production in gas wells. Can be configured to respond to oil and water, or to water only.

Discuss a configuration
FIELD DEPLOYMENT · APRIL 2026

DAR deployed in
the Johan Castberg field.

The first DAR installation was completed at Johan Castberg in the Barents Sea on 9 April 2026, in collaboration with Welltec and Equinor.

40DAR assemblies
12Well compartments
1,500 mHorizontal openhole section
Read the installation announcement

Installation milestone. Long-term field performance is not established by this announcement.

Original DAR assembly rendering from Welltec’s Johan Castberg installation announcement
ENGINEERING COLLABORATION

Innovation meets
deployment expertise.

Innowell and Welltec established a strategic partnership in 2024 to advance the commercial application of DAR technology. Specialist engineering, manufacturing and deployment capabilities support the next phase of development.

Meet Innowell
TECHNICAL RESOURCES

Explore the engineering
behind DAR.

Published papers, product documentation and the working principle — directly from the source.

Browse technical resources

Every reservoir is different.

Let’s discuss what density-based inflow control could mean for yours.

Discuss your application