Autonomous control based on fluid density.
DAR™ – Density Activated Recovery – uses density differences to distinguish between desired and undesired reservoir fluids. A different principle for inflow control.
Simple mechanics.
Selective response.
Reservoir fluids enter
Fluids enter the completion system through the designated flow path and reach the fluid control modules.
Density differences drive the response
A mechanical flotation element responds to fluid density. For water control, its density is configured between that of oil and formation water.
Inflow is restricted
When the configured unwanted-fluid fraction is reached, the module changes its restriction. Open and restricted flow performance are configured independently.
Favourable fluids can reopen the module
A small pilot flow continues through the restricted module. This allows continued fluid detection and reopening when favourable fluids return.

Reservoir fluids enter
Fluids enter the completion system through the designated flow path and reach the fluid control modules.
Watch Innowell’s working-principle videoA different principle of inflow control.
Control technologies differ in design and operating envelope. The comparison below describes principles, not universal specifications for every ICD or AICD.
| Engineering consideration | DAR density-based control | Viscosity-dependent approaches |
|---|---|---|
| Fluid discrimination | Mechanical response to fluid density differences | Depends primarily on viscosity contrast and device design |
| Changing fluid properties | Configured for the relevant density and fluid-fraction envelope | Response may vary with viscosity, flow and multiphase conditions |
| Open / restricted states | Independently configured flow restrictions; pilot flow enables detection | Operating response depends on the specific device |
| Water and gas control | Configurable WCM and GCM within a modular assembly | Capabilities vary by design and well conditions |
| Engineering assessment | Reservoir fluids and completion design must be evaluated | Reservoir fluids and completion design must be evaluated |